Ottawa Light Rail » Project Plan » Fast Facts
Sorry that fact does not exist, please choose one from the list below.
-
The $2.1 billion dollar investment in Light Rail will generate over $3.2 billion dollars worth of benefits for Ottawa and its residents.
-
Light Rail is forecast to reduce carbon dioxide emissions by approximately 38,000 tonnes per year by 2031.
-
LRT will reduce downtown traffic
-
The Downtown Ottawa Transit Tunnel will be 2.5 kilometres long.
-
The downtown portion of the LRT system will span 12.5 kilometres from Tunney’s Pasture to Blair Station and includes 13 stations.
-
15 minutes per day
-
Ottawa commuters currently make about 93 million trips per year. By 2031 that number will reach 166 million.
-
Ottawa residents take transit, on average, 125 times annually more than residents in any city of comparable size in North America.
- The Transitway conversion to rail will mean that Ottawa will use approximately 5600 fewer tonnes of salt during the winter months, improving our environment and saving an estimated $420,000 per year. Read more
- Total emission reductions have been valued at more than $68 million per year by 2031. Read more